Structural Concerns
Exterior doorways show severe damage and wear from water and salt exposure and need to be replaced.
Due to concerns raised during the inspection, the county is currently spending $3.2 million to stabilize the structure and replace the roof and rooftop HVAC system.
The interior wall in the staff bathroom shows signs of deterioration.
Crack gauges have been added to the facility to monitor structural integrity.
This crack is in a jail cell. In several areas, these cracks can be seen in the walls and in corners.
This crack is over six feet long.
Due to frequent plumbing work, part of the wall was cut out and replaced with a steel panel to allow recurring access if needed.